Design and Construction
Scroll Down for Page Content
CONTACT DETAILS
Facilities Management
Facilities@BristolCC.edu
774.357.2533
fax: 508.730.3279
777 Elsbree Street
Fall River, MA 02720
F Building
UPCOMING EVENTS
The Facilities Department Office of Design & Construction oversees planning and implementation of both large and small construction and maintenance projects.
From renovating lab rooms, to installing handrails, our department is responsible for the repair, renovation of all buildings, and new construction on all Bristol Community College Campuses.
Completed projects include:
- Building E Lab Renovations
- New Wayfinding Signage
- Installation of Handrails
- Renovation of Presidents Suite
- Construction of Veterans, Health, and Women’s Centers
- Parking Lot Signage
- Installation of automatic door operators
- Repaving of parking lot Attleboro Campus
- Upgrade of underground Electrical Distribution System
- Repair of Underground Steam Line
- Swing Gates at Enrollment Center Desk
- Lab Renovations Attleboro Campus
- New flooring G Building Student Services Area
- Removal of kitchen equipment Attleboro
Projects Underway and Future Proposed Projects
- Replacement of Roof at A Building
- Roof and Window Repair New Bedford
- Window Replacement G Building
- New Flooring at Stage Jackson Arts Center
- Installation of exterior LED Lights and Poles
- Replacement of underground Steamline System
- Installation of LED lights all buildings Fall River
- Follett Bookstore move to C Building
- Renovation of HR Office Areas
- Repaving of pathways Fall River Campus
- Pylon Wayfinding Signage Fall River Campus
- Repair of soffit at A Building